Project Name: CORREFOUR III DOHA at LANDMARK SHOPPING MALL
Project Duration: 133 Calendar Days
Project Status: In-progress
General Scope of Work: Supply, Install and Maintenance of Plumbing, Engineering and Electrical Works as described in the main contract documents and priced in the Bills of Assignment, Payment and Acceptance.
Project Name: QATAR REAL ESTATE INVESTMENT CO.
Project Duration: 3 Months
Project Status: On-progress
General Scope of Work: Supply, Installation, Testing, Commissioning and maintenance of all electrical, mechanical, plumbing and drainage system including preparation of shop drawings, as-built drawings and all guarantees, warrantees required for the project excluding external drainage & external water main.
Project Name: AL-KHOR SPORTS CLUB & AL-WAKRAH SPORTS CLUB
Project Duration: 4 Months
Project Status: On-progress
General Scope of Work: Design, Supply, Install and Commissioning of all Electrical Broadcasting Requirements & Minor Civil system including required demolition, excavation, reinstatement and all builders works, electromechanical works, diversion of existing services, protection to existing work and supply & fix of rubber flooring, raised flooring, fixing of acoustic panels for studio, control room, T.V. room. Fixing the studio lights system, A/Cs for studio room and all logistics items to be supplied by your side, all work to be carried out to entire satisfaction of the client without having right to claim any variation what so ever.
Project Name: DEVELOPMENT OF AL-ARABI SPORTS CLUB
Project Duration: 18 months
Project Status: Completed
General Scope of Work: Supply, Installation, Testing, Commissioning and Maintenance of all electrical,
Works including preparation of shop drawings, as built drawings, all guarantees and warrantees required.
Project Name: A.B.M. MILITARY COLLEGE AT DUHAILIYAT
Project Duration: 7 Months
Project Status: On-progress
General Scope of Work: Supply, Installation, Testing, Commissioning and maintenance of all electrical, mechanical, plumbing and drainage system including preparation of shop drawings, as-built drawings and all guarantees, warrantees required for the project excluding external drainage & external water main.
Completed Projects:
1. EPIC of Improvements to NGL Complex Main Security Gate Area-Mesaieed, GTC/04/107
2. Four (4) Nos. High Mast Upgrading for Main Football Field @ Al-Arabi & Qatar Sports Clubs
3. Broadcasting System Infrastructure Works @ Al-Arabi & Qatar Sports Clubs
4. Development of Khalifa Tennis & Squash Complex, Upgrading of Indoor Tennis Courts
5. Upgrading of Nine (9) Nos. Stores @ Doha Naval Base, D-527-02
6. Refurbishment of Existing Dog Kennels into Electronic War Center @ Doha Air Base, C-647-01
7. Refurbishment of Technip Store & Asphalt Paving/Fencing @ Store Yard in QP Refinery, LTC 053/03
8. Al-Baker Gardens (58 Nos. Villa Complex) @ Al-Hilal
9. Al-Udeid Project - Package 4 Addendum No. 01 (Z-105-05A) Apron Grounding Works
10. Reconfiguration of AAFES & PX Expansion Project in USAF Base @ Sailyah Camp
11. General Services Installations for West Asian Games Mobile Central Kitchen @ Industrial Area
12. Furnishing, Installation, Testing & Commissioning of MCCB's @ Qatar University
13. Al - Jazeera Power Supply Modifications
14. Power Supply to Airconditioning System in Eight (8) No. Stores @ Al-Bussair Camp, G-601-01
15. Ramada Function Room Renovation
16. Development of Al-Khor & Al-Wakrah Sports Clubs Broadcasting System Infrastructure Works, SFID/M/88
17. Repair & Maintenance of MV Panel @ Duhailiyat Camp
Other On-going Projects:
1. Carpentry Shop @ Industrial Area
2. External Toilet Block for Qatar Emiri Maintenance Arm HQ @ Al-Sailiyah Camp, F-623-01
3. Proposed Palace for Shk. Abdullah Bin Jabor Al-Thani @ Ain-Khaled
4. Maintenance of Parade Ground Lighting @ North Camp
5. B+G+6 Residential Building @ Ghanem Al-Qadeem
6. Telephone System Infrastructure Works for Band Unit @ Sailiyah Camp
7. Jamal Residential Villa @ West Bay
8. Barzan Camp (Emiri Guard) Sport Hall Painting & Renovation Works
9. Power Supply to Air-Conditioning System in Eight (8) Nos. Stores @ Al Bussair Camp
10. Installation of Light Fitting @ Hamad Womens Auditurium
Forthcoming Projects:
1. Suppy & Installation of Thirty Four (34) Nos. of Air Condition Unit @ Duhailiyat Camp
2. Renovation of Central Store @ Qatar University
3. Upgrading of Existing Approach Roads & Construction of Car Shelters for Various QP Facilities
4. Office Building for Missile Squadron @ HNR North Camp
5. Corrective Maintenance for Indoor / Outdoor Swimming Pool for Hamad Mechanized Regiment @ North Camp
6. Supply & Installation of Twelve (12) Units Split Type Air Conditions in Salary Directorate @ Sailiyah Camp
7. Others to be updated from time-to-time